This post is also available in: Indonesian
PLTA Asahan 1 has been managed and operated by PJB Services since 2014, utilizing Lake Toba water which is flowed through a 6.5 km long tunnel. Asahan 1 PLTA annually generates a minimum of 1,175 GWh/year of electrical energy and 8.53% of the contributors to electricity in Northern Sumatra.
_
By implementing Generation Governance and Enterprise Asset Management, based on Maximo’s Computerized Maintenance Management System, and supported by competent human resources, PLTA Asahan 1 shows performance excellence, electrical energy production always exceeds the target set by the Asset Owner, which is between 100.96% to 117.57 % and zero work accidents.